CE CZPT CD sequence electrical wire rope hoist
Details:
Capacity: From .5 to 20T
Wire Rope length: six-30m
Voltage: 380/440V
Catalog:
Model | CD1,MD1 | ||||||
Capacity | Tons | .5 | one | 2 | 3 | five | 10 |
Lifting top | M | six,9,12 | six,9,12,18,24,thirty | 9,twelve,eighteen,24,30 | |||
Lifting speed | M/min | eight(.8/eight) | seven(.7/seven) | ||||
Travel speed | M/min | twenty/thirty | |||||
Wire rope | Dia.(mm) | four.eight | 7.four | eleven | thirteen | 15 | fifteen |
Spec. | six*37+FC | ||||||
CZPTing Motor | Type | ZD 121-4 | ZD 122-4 | ZD 131-four | ZD 132-four | ZD 141-4 | ZD 151-four |
ZD S1 .two/.eight |
ZD S1 .2/1.5 |
Z S 1 .4/3. |
ZD S1 .four/four.five |
ZD S1 .8/seven.5 |
ZD S1 one.five/13 |
||
Energy(kw) | .eight (.2/.eight) |
1.five (.two/one.five) |
3 (.4/three.) |
four.five (.4/4.5) |
7.5 (.8/seven.five) |
thirteen (1.five/thirteen) |
|
Rotation Speed(r/min) | 1380 | 1400 | |||||
Existing(A) | two.two (.seventy two/two.four) |
four.3 .72/four.3) |
7.6 (1.25/7.6) |
eleven (2.four/eleven) |
eighteen (2.four/eighteen) |
30 (five.two/thirty) |
|
Travel Motor | Type | ZDY 111-four | ZDY 112-4 | ||||
Electricity(kw) | .2 | .2 | .four | .4 | .8 | .8*2 | |
Rotation Velocity(r/min) | 1380 | ||||||
Present(A) | .72 | .seventy two | 1.twenty five | one.25 | 2.four | 2.4 | |
Electrical power | AC 380V, 50HZ, 3 Period |
Application:
Design CD1,MD1 CZPT Wire CZPT is a little-sized lifting products, which can be mounted on one beam, bridge, gantry and arm cranes.
With slight modification, it can also be utilised as a winch.
It is broadly employed in factories, mines, harbours, warehouses, cargo storage areas and shops, essential in elevating functioning effectiveness and improving doing work conditions.
Product CD1 electric powered hoist has only standard velocity, which can fulfill typical software.
Model MD1 CZPT CZPT offers two speeds: typical speed and minimal pace. At a lower velocity, it can do specific loading and unloading, mounding of sand box, routine maintenance of machine tools, and so on.
Notice:
The regular lifting peak is 6,9,12,18,24 and thirty meters.
The lifting pace can be solitary speed or double speed, even multi-speed with frequency inverters.
The appropriate rail for the reduced-headroom hoist is H-sort rail, and I-type rail is also CZPT.
The recommended rope reeving of this type of hoist is two/1, 4/two or 4/1.
The normal travelling speed is 20m/min, and twelve.5,sixteen,twenty five,32m/min by request.
Package:
CZPT powerful PLY wooden situation
Robust picket pallet.
Company Introduction
ZheJiang CZPT Union I&E Co.,Ltd is a single of the top Exporters, Stockist & Suppliers for Lifting Things for the final ten years.
It is a make a difference of great satisfaction to advise you that we are getting cordial business relation with several different fields businesses and manufacturers all through the globe. It is unnecessary to emphasis that in see of our huge knowledge in the line we are in a situation to fulfill your valued demands of Lifting Tools and Hand Tools and Things of each and every description and specifications at average price.
CZPTly welcome your inquiry and path buy. We are looking forwad to the agency and lengthy-time period company connection with you.