Merchandise DESCRIPTION
The CZPT Link Assembly is composed of a main ring, two or much more sub-rings, in which the main ring is fully cast, the sub-ring is welded, and the content is Alloy metal. The specification is 1-100 tons,and the protection element is 4 times.
It is mainly utilised to assemble the spreader. The sub-ring is linked with the Website link Chain and thechain connection, and is assembled into a synthetic rigging for lifting heavy objects and gear.
It can be utilised for equipment,industries.
The solution has passed the environmental administration system certification, and can handlethe merchandise certification of effectively-acknowledged classification societies these kinds of as CCS, LR, DNV, etc.
The solution has higher strength, light-weight weight, exquisite design, robust flexibility, various features, and convenient security inspection
Technical PARAMETERS
A-345 master hyperlink assembly breaking load (4XWLL) | ||||||||
specification | Within duration | Inside width | diameter | WLL(T) | Fat(KG) | |||
3/four | one hundred forty | 85 | 70 | 40 | 20 | fourteen | 4.2 | 1.sixty seven |
seven/8 | one hundred sixty | eighty five | ninety five | forty | 22 | 14 | 5.3 | 2.two |
one | 178 | 100 | 89 | 60 | 25 | eighteen | 8 | three.29 |
one-1/4 | 220 | 100 | a hundred and ten | sixty | 32 | 22 | 14 | six.3 |
one-1/2 | 267 | a hundred and eighty | 135 | one hundred | 38 | thirty | 21.2 | thirteen.seven |
1-3/four | 305 | one hundred eighty | 152 | a hundred | 45 | 32 | 30 | 21.twenty five |
two | 356 | one hundred eighty | 178 | a hundred | fifty | 38 | 39.4 | 30.34 |
two-1/4 | 406 | one hundred eighty | 203 | a hundred | 57 | forty five | 45 | 39.87 |
two-1/two | 406 | 355 | 203 | 178 | 64 | 50 | 55.five | 64.four |
two-three/4 | 406 | 406 | 241 | 203 | 70 | fifty seven | sixty three | 89 |
3 | 457 | 406 | 228 | 203 | seventy six | sixty four | 70 | 112.14 |
Usually packed in plastic baggage, and then in export carton, substantial high quality pallets Supply Depth: Usually 25-thirty doing work days after obtaining your progress payment.Bulk packing
Packed in picket instances
Packed in paper bins, then in pallets
Supply Element:
Generally 25 times following acquiring your advance payment.
FAQ
one.Are your producer or Investing Business?
First rigging is specialist maker, far more than 20 years experience.
two. What goods do you source?
one) Lifting website link chain, Coal Mining chain
two) Round CZPT link
three) Other relevant products
three.What is your direct time?
Typically 25-30 operating times right after getting your progress payment.
4. How do I receive the merchandise ?
FOB, CFR, CIF are most generally utilised trade conditions.
5.How do I pay?
TT(Telegraphic Transfer),thirty% payment in advance, 70% balance
prior to shipment.
Get in touch with US
Any desire remember to really feel cost-free to get in touch with Nancy!
Internet site: