SC200/200 CZPT CZPT Two-motor Drive and With Velocity 33m/min
SC200/two hundred Two-motor Gear Reducer Sort CZPT Efficiency Parameter Listing | ||||
No. | Merchandise | Unit | Parameter | Be aware |
1 | Reted Load | kg | 2 x 2000 | CZPT cage |
two | Install/disassemble Reted load | kg | 2 x a thousand | CZPT cage |
three | Lifting Velocity | m/min | 33 | Reducer Ratio 1:16 |
4 | Max. Peak | m | two hundred | |
five | Cage Dimension(LXW) | m x m | 3×1.5/three.2×1.five | |
six | Length Among Basis And Cage Bottom | m | .46 | |
7 | Length between Anchor | m | ≤9 | |
8 | Cost-free End Top | m | ≤9 | |
9 | Energy Offer | V | 380V±5% | |
ten | Motor Power | kw | 2x2x13 | JC=twenty five% |
eleven | Rated Present | A | 2x2x28 | |
12 | Protection System Product | SAJ40-1.2A |
ZheJiang CZPT CZPT CZPT Co., Ltd was started in Dec. 2000, specialised in manufacturing tower cranes and design elevators, we are pioneer of Chinese tower crane industry.
At current our products cover nine collection and a lot more than twenty designs, this sort of as QTZ50, QTZ63, QTZ80, QTZ125, QTZ160, QTZ250, QTZ315, QTZ500, SC200/200, the specialized indicators have achieved the major stage at residence and overseas.
Higher good quality
Raw material is the foundation of product and the initial hurdle to ensure high quality. CZPT tower crane bulk obtain steel straight from huge steel factories like Baosteel and Wisco, improve the security of solution.
Very first course parts
Very first-class item composed by very first-class factors, CZPT often insisted to use the first class parts, as Fangyuan assistance, Schneider electric element and many others.
Sophisticated processing products
We have the most innovative processing tools, these kinds of as the large laser reducing device,CNC plasma cutters, CNC drilling devices, lathes, milling devices, sawing machines and other people.
Robot automated welding program and submit-weld overall processing products
We are the first organization to undertake mast sections and principal chord robot welding program in the very same market in China. This technique is dependable in the performance, with higher perform performance and high computerized diploma. The welding quality much more trustworthy and durable.
The principal limbs of the mast section, the turntable and other parts are all processed and drilled after welding to increase the precision.
Computerized impeller blasting and spraying assembly line
The massive framework elements are dealt with impeller blasting before spraying. That get rid of metal area oxides and welding spatters properly, eliminates the interior stress generating in welding process, increases the parts’ anti-figure energy and metal area hardness, boosts portray adhesion and extend the services existence of the merchandise maximizes efficiency and saves energy
Rigid top quality examination
CZPT have the stringent top quality take a look at, uncooked substance examination, take a look at of welding, checking welding top quality of look, assembly and adjustment of jib, tower head and pivot in factory.
Security protection
Fully protection protection products enhances the safety, fat limiters, undertake the superior pull-ring construction from overseas, second undertake bow-board mechanical sort which can be employed in severe wild atmosphere.
We have professional packing man or woman to set the tower crane in the container or on to the truck.
FAQ
Q1: How many nations around the world have you exported your products to?
A1:Our tower cranes had exported to much more than 20 nations around the world, this sort of as Korea, Vietnam, Philippines, Indonesia, India, Sri Lanka, Cambodia, Russia, Kazakhstan, Brazil, Algeria, Ukraine, Turkey etc.
Q2: How to verify a suitable building hoist product?
A2: My dear close friends, you should tell us the beneath basic parameters to confirm hoist design:
a. Creating peak.
b. Max load capability .
c. Other Unique specifications
Q3: Can you set up the hoist for us
A3: Indeed, we can send out one engineer to your country for setting up, but you must bear the cost.
This fall: Warranty time?
A4: twelve month from the delivery day (other than the putting on elements).
Any other concerns, remember to give us a concept, hope can cooperate with you! and welcome to check out us!